$25 OFFyour first rental · call now to claim your discount
Construction & Demolition Dumpsters

Jobsite Dumpsters, One Upfront Price.

Roll-offs from 10 to 40 yards for construction and demolition debris across Dutchess, Putnam and Westchester. One upfront price with the weight included, so you know the number before the container drops.

Upfront pricing, no tiers10 to 40 yard roll-offsSame-day drop-offFamily owned since 1994

Framing, roofing, gut renovations, demo debris. We drop a container where you need it, swap it when it fills, and keep the site clear so your crew keeps working. You get a rate quoted up front, including how much weight is covered, so the invoice at the end of the job holds no surprises.

Dumpster rates.

Every size includes a set amount of weight.

DumpsterWeight includedPrice
10 yard1 ton (2,000 lbs)$550
15 yard1.5 tons (3,000 lbs)$625
20 yard2 tons (4,000 lbs)$750
30 yard3 tons (6,000 lbs)$895
40 yard4 tons (8,000 lbs)$1,150

All prices plus tax. Concrete and other heavy material go in a dedicated container: 10 yard $950, 15 yard $1,500. See full pricing.

What goes in.

Mixed construction and demolition debris, plus dedicated containers for the heavy stuff.

Construction debris

Lumber, drywall, framing offcuts, roofing, siding, insulation, packaging and general jobsite waste.

Demolition debris

Gut-out material from kitchens, baths and full interiors. Cabinets, tile, flooring, fixtures and plaster.

Concrete & heavy material

Concrete, brick, block and dirt go in a dedicated 10 or 15 yard container priced for the weight.

How it works on site.

Placed where you want it, swapped when you need it.

Call with the job

Tell us the material, the size you think you need and the drop date. We confirm the rate up front.

We place it

Driveway, lot or street. Tell us where it needs to sit and we work around access and clearance.

Swap as it fills

On longer builds we swap a full container for an empty one so the crew never stops to wait.

Final haul

Last pull when the job wraps. You get a weight ticket and an invoice that matches the quote.

Construction dumpster FAQ.

What size do I need for a construction job?

A 10 or 15 yard suits a single-room gut or a small roof. Most framing and renovation jobs land on a 20 or 30 yard. Full builds and large demo take the 40 yard. Call with the scope and we will size it with you rather than sell you more container than the job needs.

Can you put concrete in a regular dumpster?

No. Concrete, brick, block and dirt are far heavier than mixed debris, so they go in a dedicated container: $950 for a 10 yard or $1,500 for a 15 yard. Keeping it separate is what keeps the price predictable.

Can you swap containers mid-job?

Yes. On multi-week builds we run swap-outs so a full container leaves and an empty one lands the same trip where scheduling allows. Call ahead with your timeline and we will plan the swaps around your build.

Do I need a permit to place one?

On private property, driveway or lot, generally no. If the container has to sit on a public street, most towns in Dutchess, Putnam and Westchester require a permit from the town or village. Rules vary by municipality, so check with your town clerk and we will work with whatever the permit allows.

Which areas do you serve?

Dutchess, Putnam and Westchester counties. See every town we cover or call 914-737-0823 with your jobsite address.

Get a container on site.

Tell us the job and we’ll quote it on the call.

914-737-0823